產(chǎn)品時(shí)間:2023-09-14
XLH-F-A唐山皮帶打滑開(kāi)關(guān),打滑用于檢測(cè)帶式運(yùn)輸機(jī)在運(yùn)行中的膠帶與主動(dòng)滾筒之間的打滑,防止打滑所造成的惡性事故,該還可用于多條膠帶機(jī)聯(lián)鎖啟動(dòng)和停機(jī),速抱閘保護(hù)。H - Ⅲ-ski etector use to etect belt in the operation of aircraft in the tape an take the initiative to
XLH-F-A唐山皮帶打滑開(kāi)關(guān)使用說(shuō)明書(shū)
XLH-F-A唐山皮帶打滑開(kāi)關(guān)外主打產(chǎn)品
XLH-F-A的接線與安裝方法
XLH-F-A的用途
XLH-F-A的詳細(xì)介紹
一、概述 Overview
H--Ⅲ型打滑用于檢測(cè)帶式運(yùn)輸機(jī)在運(yùn)行中的膠帶與主動(dòng)滾筒之間的打滑,防止打滑所造成的惡性事故,該還可用于多條膠帶機(jī)聯(lián)鎖啟動(dòng)和停機(jī),速抱閘保護(hù)。H - Ⅲ-ski etector use to etect belt in the operation of aircraft in the tape an take the initiative to rum between the ski an prevent skiing cause by the vicious incient, the etector can also be use for a number of belt-chain start-up an shutown, Have low gate protection.
二、使用條件及技術(shù)參數(shù) Secon, conitions of use an technical parameters
工作電壓: AC220V Voltage: AC220V
環(huán)境溫度: -35&orm;C ~+60&orm;C Ambient temperature: -35 &orm; C ~ +60 &orm; C
相對(duì)濕度: 不大于95% (25&orm;C時(shí)) Relative Humiity: not more than 95% (25 &orm; C)
: Protection levels:
工作位置: 帶式運(yùn)輸機(jī)上膠帶下面。Work here: belt transport planes on the tape below.
在膠帶機(jī)起車(chē)或停機(jī)過(guò)程中應(yīng)不投入或投入無(wú)效。In the tape machine from the car or parking in the course of inputs or input shoul not be invali.
輸出接點(diǎn)數(shù)量: 一常開(kāi)、一常閉一組轉(zhuǎn)換接點(diǎn)。Output contact: a normally open, normally close contact a group of conversion.
觸點(diǎn)容量: AC380V 3A Contact capacity: AC380V 3A
動(dòng)作方向: 雙向 Action irection: two-way
三、規(guī)格數(shù)據(jù)表 Thir, the ata sheet specifications
型號(hào)
Moel
打滑率(%)
(%)Moel ski rate
適用帶速(m/s)
(m/s)Applie with spee
觸輪直徑(mm)
(M / s) iameter roun contravene
重量
(公斤)
(Kg)
H&mash;Ⅲ
20-30
0.8-6
116
4
四、 工作原理 principle
H--Ⅲ型打滑工作時(shí),通過(guò)膠帶帶動(dòng)觸輪,使觸輪反應(yīng)出膠帶的實(shí)際帶速,觸輪帶動(dòng)內(nèi)傳動(dòng)軸,使產(chǎn)品內(nèi)部繼電器工作,繼電器工作主要是由輪片切割光電信號(hào),由內(nèi)設(shè)固定數(shù)值與實(shí)際值產(chǎn)生對(duì)比數(shù)值從而產(chǎn)生通斷信號(hào),完成檢測(cè)帶速工作,如果膠帶速度與主滾筒速度不同步并下降到正常帶速的20-30%時(shí),接點(diǎn)通斷信號(hào)發(fā)生變化,重新輸出一組信號(hào)給控制室,警示膠帶已處于嚴(yán)重打滑狀態(tài)。H - Ⅲ-ski etector work, riven through the tape inconsistent roun, inconsistent roun of reaction to the actual tape with spee, touch etector roun lea in the rive shaft so that the proucts within the relay, the relay is primarily the work Roun-cutting photoelectric signal from the internal fixe numerical comparison with the actual numerical values resulting in on-off signal, complete with spee etection work, if the tape spee an the spee is not the main rum an roppe to sync with the normal spee of 20-30% , The contact-off signal change, a group of re-exports signal to the control room, warning staff have been in a serious ski Belt state.
五、安裝與接線 installation an wiring
1、安裝 the installation
H-Ⅲ型打滑安裝時(shí),可按下述要求并滿(mǎn)足現(xiàn)場(chǎng)使用條件安裝在帶式運(yùn)輸機(jī)上膠帶的下面,安裝后應(yīng)膠帶有料情況下使打滑與膠帶面平行,同時(shí)膠帶無(wú)料運(yùn)轉(zhuǎn)時(shí)觸輪與膠帶面應(yīng)接觸,且安裝位置在振動(dòng)zui小和膠帶抖動(dòng)zui小的地方。當(dāng)采用輸出軸和從動(dòng)滾筒軸連接檢測(cè)膠帶實(shí)際帶速的方法時(shí),可按安裝示意圖并選用柔性連軸器以產(chǎn)品工作正常。體安裝詳見(jiàn)安裝示意圖: H-Ⅲ ski-etection evis, can meet the following requirements an conitions for the use of site-installe in the zone below the plane on the tape, after the installation shoul ensure that the tape is expecte uner the circumstans to ski etector surfa parallel with the tape, no tape Liu etector when running conflict with roun fa with the tape shoul be a relile contact, an the installation location guarantee that the minimum vibration an plastic jitter smallest plas. When a etector output shaft an the riven pulley shaft connecte with the actual tape spee etection metho, the iagram can be installe an even the optional flexible shaft is to ensure that the prouct is working. Sketch Show install specific installation:
2、使用與接線 an the use of wiring
使用單位在使用H-Ⅲ型打滑時(shí)只要將產(chǎn)品按安裝示意圖安裝在相應(yīng)的位置上即可,我廠提供的產(chǎn)品均是按用戶(hù)訂貨時(shí)提出的要求制造的。由于理論上的帶速和實(shí)際膠帶運(yùn)行速度有差異,用戶(hù)屆時(shí)可按我廠提供調(diào)整辦法適當(dāng)?shù)恼{(diào)整以切實(shí)正常工作狀態(tài),用戶(hù)接線時(shí)按接線示意圖正確接線即可。The use of units in the use of H-Ⅲ-ski etector, as long as the proucts will be installe by the installation iagram in the corresponing position can be, I plant the proucts are orere by customers at the request of the prouction. As a theoretical an practical tape spee with spee are ifferens, the user then I can ajust to Plant to provie the nessary ajustments to ensure the normal work for state, accoring to the user when the cle wiring iagram to the right wiring.
1紅線
2黃線
3蘭線
4
5
公共點(diǎn)
開(kāi)點(diǎn)
閉點(diǎn)
電源AC220V
1.re line
2.yellow line
3blue line
4
5
Public point
A point
Close points
power AC220V
六、訂貨須知 orering Noti
1、在訂貨時(shí)請(qǐng)注明產(chǎn)品型號(hào)、名稱(chēng)和數(shù)量。例如:H-Ⅲ型打滑10臺(tái) in orer, please specify Moel, the name an number. For example: H-Ⅲ-10 ski etector
2、請(qǐng)說(shuō)明膠帶機(jī)型號(hào)、帶寬、帶速和打滑率。please note tape machine moels, banwith, with rate of spee an slippery.
3、若用戶(hù)將打滑用于速保護(hù)和速抱閘檢測(cè),使用時(shí)須將速抱閘額值和超數(shù)保護(hù)額定值注明以便調(diào)試。if you will ski etector for the protection of low-spee an low-spee testing have gates, shoul be use when the gates of low value an have superovulation protection rating to inicate ebugging.
湖北杭榮電氣有限公司 網(wǎng)址:www.ekacn.cn
地址:湖北省麻城市龍池工業(yè)區(qū)杭榮科技園 傳真:0713-2115868 技術(shù)支持:智能制造網(wǎng) 管理登陸 備案號(hào):鄂ICP備15020148號(hào)-4 GoogleSitemap